{"id":30354,"date":"2025-09-18T08:41:25","date_gmt":"2025-09-18T01:41:25","guid":{"rendered":"https:\/\/gapki.id\/en\/?p=30354"},"modified":"2025-09-26T08:47:23","modified_gmt":"2025-09-26T01:47:23","slug":"trial-still-unfinished-b50-not-yet-ready-to-go-in-2026","status":"publish","type":"post","link":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/","title":{"rendered":"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026"},"content":{"rendered":"<p>JAKARTA \u2013 The government could not yet ensure whether to upgrade its biodiesel mandatory program from the current B40 to B50 in 2026 as its trial use is not yet finalized until now. Energy and Mineral Resources (ESDM) Minister Bahlil Lahadalia said that the final decision depends on the result of B50 trial use, which is still being undertaken.<!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-30355\" src=\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg\" alt=\"\" width=\"997\" height=\"660\" srcset=\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg 997w, https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_-300x199.jpg 300w, https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_-768x508.jpg 768w\" sizes=\"auto, (max-width: 997px) 100vw, 997px\" \/><\/p>\n<p>According to Bahlil, despite the B40 program is seen progressing well, the government could not yet make sure whether it will be directly upgraded to B50 or to B45 first before B50.<\/p>\n<p>\u201cWe\u2019re conducting a trial. Whether we directly upgrade to B50 or to B45 first, it will depend on the trial result. If it is proven in good performance, then we\u2019ll formally announce our decision,\u201d the minister said at the Jakarta state palace on Friday (12\/9\/2025).<\/p>\n<p>It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road test will be finalized. He only stated that the government did not want to hurry without technical certainty derived from the test.<\/p>\n<p>Previously, Renewable Energy and Energy Conservation (EBTKE) Director General Eniya Listiani Dewi said that the target of starting the B50 program in early 2026 was still unchanged. She projected that the trial will take six to eight months to test the engine durability to the use of mixture of diesel fuel and biodiesel from the palm oil.<\/p>\n<p>\u201cMinister and Deputy Minister still stick to the initial plan in early 2026. But the exact month will be decided according to the result of the trial,\u201d Eniya said in the middle of last month (August).<\/p>\n<p>But despite the fact, the directorate general of renewable energy and energy conservation (Ditjen EBTKE) has continued the preparations of all of the necessities for the implementation of the mandatory B50 in early 2026.<\/p>\n<p><strong>Rejection from mining industry<\/strong><\/p>\n<p>Meanwhile, the B50 plan has drawn criticism from the mining sector. The Indonesia Mining Association (IMA) said that the burden caused by the B40 application alone is already heavy for the industry.<\/p>\n<p>IMA Executive Director Hendra Sinadia stated that the government should conduct periodic evaluation on the implementation of B40 policy. \u201cAccording to prevailing laws, the evaluation should have been conducted in every three months, involving all stakeholders along the supply chain to get inputs on its implementation so far,\u201d he said. (*)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JAKARTA \u2013 The government could not yet ensure whether to upgrade its biodiesel mandatory program from the current B40 to B50 in 2026 as its trial use is not yet finalized until now. Energy and Mineral Resources (ESDM) Minister Bahlil Lahadalia said that the final decision depends on the result of B50 trial use, which&hellip;&nbsp;<a href=\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\" class=\"\" rel=\"bookmark\"><span class=\"screen-reader-text\">Trial Still Unfinished, B50 Not Yet Ready To Go In 2026<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":30355,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"off","neve_meta_content_width":70,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","neve_meta_reading_time":"","footnotes":""},"categories":[3708,3709],"tags":[],"class_list":["post-30354","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-publication","category-recent-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Trial Still Unfinished, B50 Not Yet Ready To Go In 2026 - Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)<\/title>\n<meta name=\"description\" content=\"It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road..\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026 - Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)\" \/>\n<meta property=\"og:description\" content=\"It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road..\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-18T01:41:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-26T01:47:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"997\" \/>\n\t<meta property=\"og:image:height\" content=\"660\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/gapki.id\/en\/#\/schema\/person\/c2cee368ea6173d53e932e04704efe25\"},\"headline\":\"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026\",\"datePublished\":\"2025-09-18T01:41:25+00:00\",\"dateModified\":\"2025-09-26T01:47:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\"},\"wordCount\":401,\"publisher\":{\"@id\":\"https:\/\/gapki.id\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg\",\"articleSection\":[\"Publication\",\"Recent News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\",\"url\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\",\"name\":\"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026 - Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)\",\"isPartOf\":{\"@id\":\"https:\/\/gapki.id\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg\",\"datePublished\":\"2025-09-18T01:41:25+00:00\",\"dateModified\":\"2025-09-26T01:47:23+00:00\",\"description\":\"It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road..\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage\",\"url\":\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg\",\"contentUrl\":\"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg\",\"width\":997,\"height\":660},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gapki.id\/en\/#website\",\"url\":\"https:\/\/gapki.id\/en\/\",\"name\":\"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)\",\"description\":\"Indonesian Palm Oil Association (IPOA)\",\"publisher\":{\"@id\":\"https:\/\/gapki.id\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gapki.id\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/gapki.id\/en\/#organization\",\"name\":\"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)\",\"url\":\"https:\/\/gapki.id\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gapki.id\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/i0.wp.com\/gapki.id\/dir-site\/uploads\/2023\/10\/LOGO_GAPKI_TRANS-P.png?fit=979%2C826&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/gapki.id\/dir-site\/uploads\/2023\/10\/LOGO_GAPKI_TRANS-P.png?fit=979%2C826&ssl=1\",\"width\":979,\"height\":826,\"caption\":\"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)\"},\"image\":{\"@id\":\"https:\/\/gapki.id\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/gapki.id\/en\/#\/schema\/person\/c2cee368ea6173d53e932e04704efe25\",\"name\":\"admin\",\"sameAs\":[\"https:\/\/gapki.id\/en\/\"],\"url\":\"https:\/\/gapki.id\/en\/news\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026 - Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)","description":"It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road..","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/","og_locale":"en_US","og_type":"article","og_title":"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026 - Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)","og_description":"It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road..","og_url":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/","og_site_name":"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)","article_published_time":"2025-09-18T01:41:25+00:00","article_modified_time":"2025-09-26T01:47:23+00:00","og_image":[{"width":997,"height":660,"url":"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#article","isPartOf":{"@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/"},"author":{"name":"admin","@id":"https:\/\/gapki.id\/en\/#\/schema\/person\/c2cee368ea6173d53e932e04704efe25"},"headline":"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026","datePublished":"2025-09-18T01:41:25+00:00","dateModified":"2025-09-26T01:47:23+00:00","mainEntityOfPage":{"@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/"},"wordCount":401,"publisher":{"@id":"https:\/\/gapki.id\/en\/#organization"},"image":{"@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg","articleSection":["Publication","Recent News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/","url":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/","name":"Trial Still Unfinished, B50 Not Yet Ready To Go In 2026 - Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)","isPartOf":{"@id":"https:\/\/gapki.id\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage"},"image":{"@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg","datePublished":"2025-09-18T01:41:25+00:00","dateModified":"2025-09-26T01:47:23+00:00","description":"It was reported that the B50 trial process is now entering the third stage. But Minister Bahlil was reluctant to elaborate when the road..","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gapki.id\/en\/news\/2025\/09\/18\/trial-still-unfinished-b50-not-yet-ready-to-go-in-2026\/#primaryimage","url":"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg","contentUrl":"https:\/\/gapki.id\/en\/dir-site\/uploads\/2025\/09\/ai_b50_plane_pesawat_sawit_biodiesel_.jpg","width":997,"height":660},{"@type":"WebSite","@id":"https:\/\/gapki.id\/en\/#website","url":"https:\/\/gapki.id\/en\/","name":"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)","description":"Indonesian Palm Oil Association (IPOA)","publisher":{"@id":"https:\/\/gapki.id\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gapki.id\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/gapki.id\/en\/#organization","name":"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)","url":"https:\/\/gapki.id\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gapki.id\/en\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/gapki.id\/dir-site\/uploads\/2023\/10\/LOGO_GAPKI_TRANS-P.png?fit=979%2C826&ssl=1","contentUrl":"https:\/\/i0.wp.com\/gapki.id\/dir-site\/uploads\/2023\/10\/LOGO_GAPKI_TRANS-P.png?fit=979%2C826&ssl=1","width":979,"height":826,"caption":"Gabungan Pengusaha Kelapa Sawit Indonesia (GAPKI)"},"image":{"@id":"https:\/\/gapki.id\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/gapki.id\/en\/#\/schema\/person\/c2cee368ea6173d53e932e04704efe25","name":"admin","sameAs":["https:\/\/gapki.id\/en\/"],"url":"https:\/\/gapki.id\/en\/news\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/posts\/30354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/comments?post=30354"}],"version-history":[{"count":1,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/posts\/30354\/revisions"}],"predecessor-version":[{"id":30356,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/posts\/30354\/revisions\/30356"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/media\/30355"}],"wp:attachment":[{"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/media?parent=30354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/categories?post=30354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gapki.id\/en\/wp-json\/wp\/v2\/tags?post=30354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}